Mission Control — Aurora-7 nominal, T-minus 4 days
Operations desk · 24/7AboutContact
Mission Brief
Home / Missions / Aurora-7

Featured Mission

One mission, in depth — payload, trajectory, timeline and the numbers behind them.

AURORA-7 · T−4 DAYS
412 km SSO · 18.4 t
Launch Services + Orbital Logistics · October 2026

Aurora-7 / Meridian Tug

Aurora-7 will launch 18.4 tonnes to a 412 km sun-synchronous orbit, including a Meridian orbital transfer vehicle tasked with last-mile delivery to three client platforms within 96 hours of separation.

The mission is the fourth contracted flight of the Meridian tug and the first to attempt three sequential rendezvous in a single mission. All manoeuvres are pre-loaded; ground intervention is not required.

VehicleAurora Heavy Lift
Payload18.4 t · 3 clients
Orbit412 km SSO
Window06:22 UTC · 4-day
T−4 DAYS
Integration complete · weather 92% GO · fuel load 86%
Full Mission Brief

Flight Sequence

T−04:00 · FUEL LOAD

Propellant loading begins

RP-1 and LOX load sequenced to the minute; abort threshold at 92% boil-off rate.

T−00:12 · TERMINAL COUNT

Guidance on internal power

Vehicle transfers to internal power; flight computer assumes the count at T−12.

T+00:08:44 · SECO

Second engine cutoff

Payload stack in parking orbit; Meridian tug separates at T+00:23:00.

T+96:00:00 · COMPLETE

Third rendezvous

Final client platform receives its payload; mission declared complete.