Mission Control — Aurora-7 nominal, T-minus 4 days
Operations desk · 24/7AboutContact
Mission Brief
MISSION CONTROL · AURORA-7 · NOMINAL

Orbital logistics,
engineered to close

Stratos designs, builds and operates orbital logistics platforms. Fourteen missions flown. 100% payload delivery. Every delta-v budget in our books reconciles to the metre.

TELEMETRY · AURORA-7T−04:11:26
Payload Mass
18.4 t
Target Orbit
412 km SSO
Launch Window
06:22 UTC
Weather
92 % GO
Fuel Load86%
Integration100%

Active Programmes

All programmes →

Flight Heritage

14Missions flown
100%Payload delivery
236 tMass to orbit
72 hTurnaround target

Mission Timeline

Full manifest →
2026.10 · T−4 DAYS

Aurora-7 / Meridian Tug

Fourteen tonnes of logistics payload to a 412 km sun-synchronous orbit, with in-orbit delivery to three client platforms.

2026.06 · COMPLETE

Aurora-6 / Halcyon-2

Earth observation platform deployed on schedule; the bus has since returned 41,000 scenes.

2026.01 · COMPLETE

Aurora-5 / Rideshare

Eleven secondary payloads, eleven orbit insertions, zero post-launch manoeuvres required.

2025.08 · COMPLETE

Aurora-4 / First Tug Flight

Meridian-1 completed the first commercial last-mile delivery to cislunar transfer orbit.

Capability Matrix

Current vehicle and platform capabilities
SystemClassCapacityOrbitsStatus
Aurora Heavy LiftReusable LV40 t LEOLEO · SSO · GTOOperational
Meridian TugOrbital transfer18 tSSO · GEO · CislunarOperational
Halcyon PlatformPayload bus1.2 tLEO · SSOOperational
Aurora Block IIReusable LV60 t LEOLEO · GTO · TLIIn test