SBB needed 41,000 m² of new deck over four live rail corridors at Zürich North Quay — with no full possessions available. Every night closure was 6.5 hours; there were 312 of them in the programme. A conventional cast-in-place slab would have needed 40-hour pours.
Our answer: a precast, post-tensioned segmental deck in 2.4 m units, each weighing under the crane's night rating, stitched with in-situ joints poured inside the same shift. The rail stayed live, one corridor at a time, for the entire twenty months.
The deck opened on 4 September 2027, eleven months ahead of the in-situ baseline. Instrumentation installed during construction now streams strain and temperature data to our Zürich office — the first MERIDIAN project with a live digital twin feeding back into the maintenance manual.
The operator has adopted the segmental night-construction sequence as a standard detail for future deck replacements. We consider that the real deliverable.