Every project we have put our name on since 2019, indexed by type and place. Filter the index — or write to the office for the full documentation set.
41,000 m² post-tensioned transfer slab over a live rail corridor.
Case study →Base isolation and façade upgrade of a 1972 dock warehouse, occupied throughout.
Case study →96 m stressed-timber canopy — 4,300 unique nodes from one parametric model.
Case study →2.1 km precast segmental metro viaduct, 40 m erected per day.
Case study →A 14 m dome at 2,600 m, assembled by four people in eleven days.
Case study →An 84 m asymmetric swing bridge that closes in 90 seconds on tide power.
Case study →Bus depot with a 62 m clear-span workshop roof and zero internal columns.
Case study →A 740 m articulated harbour defence tuned to the local wave spectrum.
Case study →Acoustic isolation for a 600-seat hall floating above a metro line.
Case study →