Replacement crane rail, splice plates and a 40-year design life in the splash zone.
The Pier 7 crane rail had been patched four times in thirty years. This sheet replaces the rail entirely and details the splice plates so that no field welding is required above the waterline - the single most expensive operation in marine retrofits.
Welding above water needs habitat, coating and inspection that triples the schedule. The splice plate detail uses twelve pre-loaded bolts, assembled from a barge in one tide. The drawing took nine revisions; the assembly took a weekend.
Practice rule 02: measure twice, draw once - and never issue a sheet you would not build from yourself.