The title block, the revision triangle, and the two signatures.
Bottom right, always. Sheet number, revision letter, scale, drawn by, checked by, issued date. If any field is blank, the sheet does not leave the office - this rule has cost us exactly one deadline in 47 years, and we'd pay it again.
One drafter signs because they drew it. A second person signs because they checked it - every dimension, every note, every bolt count. The second signature is the practice. It is why our sheets have survived four decades of construction sites and one very skeptical harbor authority.
Standard note 07: "Issued for construction" is the only status that means something. Everything else is a draft with ambition.