ATLAS WORKS · Drawing No. AW-114 · Rev. C · Scale 1:50 · Est. 1978 · 214 drawings filed
Design & Detailing关于联系
Commission a Drawing
▤ ATLAS WORKS · ENGINEERING & DRAWINGS · EST. 1978 ▤

We draw first,
calculate second.

An engineering drawings practice for structural, marine and solar work. Every sheet is drawn by hand, checked twice, and signed before it leaves the office.

GRID 01 — primary structural grid @ 7.2m
SECTION A-A — cut at the crane rail, looking north
DETAIL 04 — splice plate, 12 bolts, no field weld
NBL 02 — top of steel +14.600
The Filed SheetsDisciplines
EST.1978Practice founded
DRAWINGS214Sheets filed
YEARS47Years drawing
RULE2×Check before issue
RECENTLY ISSUED

Off the drawing board

Sheets issued this quarter. Revision C or later only.

Pier 7 RetrofitSTRUCT-114
Pier 7 Retrofit

Replacement crane rail and splice plates.

❖ SHEET STRUCT-114
Harbor Bollard BaseMARIN-088
Harbor Bollard Base

Marine detail, drawn for a 40-year splash zone.

❖ SHEET MARIN-088
Tracker Array FrameSOLR-142
Tracker Array Frame

Solar structure, single-axis, 1,200 modules.

❖ SHEET SOLR-142

Have a structure that needs arguing with?
Commission a drawing.

First sketch in five working days.

Start a Commission